TBM Net Advance Rate Prediction Model Based on Ridge Regression Analysis
[Objective] Accurate prediction of TBM (tunnel boring machine) net advance rate is of significant reference value for selecting urban tunneling methods, planning construction schedules, and controlling construction costs. [Method] Taking the dual-shield TBM construction of Qingdao Metro Line 1 as th...
Saved in:
Main Authors: | SHI Jian, ZHANG Shilin, FAN Zuosong, KONG Desen |
---|---|
Format: | Article |
Language: | Chinese |
Published: |
Urban Mass Transit Magazine Press
2025-06-01
|
Series: | Chengshi guidao jiaotong yanjiu |
Subjects: | |
Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20230594.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study of Some Kinds of Ridge Regression Estimators in Linear Regression Model
by: Mustafa Nadhim Lattef, et al.
Published: (2020-12-01) -
Interpretable machine learning approach for TBM tunnel crown convergence prediction with Bayesian optimization
by: Wanrui Hu, et al.
Published: (2025-06-01) -
Going concern prediction – A horse race between traditional and regularization machine learning models
by: Tina Vuko, et al.
Published: (2025-01-01) -
Prediction of Settlement Due to Shield TBM Tunneling Based on Three-Dimensional Numerical Analysis
by: Ji-Seok Yun, et al.
Published: (2025-06-01) -
Evaluating Estimator Performance Under Multicollinearity: A Trade-Off Between MSE and Accuracy in Logistic, Lasso, Elastic Net, and Ridge Regression with Varying Penalty Parameters
by: H. M. Nayem, et al.
Published: (2025-05-01)