TBM Net Advance Rate Prediction Model Based on Ridge Regression Analysis

[Objective] Accurate prediction of TBM (tunnel boring machine) net advance rate is of significant reference value for selecting urban tunneling methods, planning construction schedules, and controlling construction costs. [Method] Taking the dual-shield TBM construction of Qingdao Metro Line 1 as th...

Full description

Saved in:
Bibliographic Details
Main Authors: SHI Jian, ZHANG Shilin, FAN Zuosong, KONG Desen
Format: Article
Language:Chinese
Published: Urban Mass Transit Magazine Press 2025-06-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20230594.html
Tags: Add Tag
No Tags, Be the first to tag this record!