Genetic algorithm solving the scheduling problem of large-scale power grid material quality inspection bases under multiple constraints
A mathematical programming model is constructed for the scheduling problem of large-scale power grid material quality inspection bases under complex and multi constraint conditions, with the completion time of material inspection, equipment utilization rate of the base, and total equipment load as m...
Saved in:
Main Authors: | Li Lin, Chen Yongqiang |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2025-01-01
|
Series: | ITM Web of Conferences |
Subjects: | |
Online Access: | https://www.itm-conferences.org/articles/itmconf/pdf/2025/08/itmconf_emit2025_01016.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of modified genetic algorithms for solving evolutionary problems of the theory of schedules
by: D. S. Zakharov
Published: (2023-08-01) -
Algorithmic Techniques for GPU Scheduling: A Comprehensive Survey
by: Robert Chab, et al.
Published: (2025-06-01) -
An Evolutionary Algorithm for Solving Academic Courses Timetable Scheduling Problem
by: Israa Abdulameer Abduljabbar, et al.
Published: (2022-04-01) -
Use of schedule theory algorithms for task planning and time management tasks
by: М. Шматко, et al.
Published: (2024-10-01) -
Optimizing Lecture Scheduling Using Genetic Algorithm: A Case Study at Universitas Riau
by: Reno Widi Respati, et al.
Published: (2025-06-01)