Features of mechanical pulse treatment of filters and near-filter zones of in-situ uranium leaching wells
Introduction. Uranium mining by in-situ leaching (ISL) requires the use of special methods for developing wells and maintaining their design productivity (flow rate) both at the construction stage and during operation by carrying out repair and restoration work (R&R). The operation of proces...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Sergo Ordzhonikidze Russian State University for Geological Prospecting
2025-04-01
|
Series: | Известия высших учебных заведений: Геология и разведка |
Subjects: | |
Online Access: | https://www.geology-mgri.ru/jour/article/view/1123 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|