ANN prediction model of final construction cost at an early stage
Previous studies developed models to predict final construction cost (FCC) values based on many inputs, which makes them difficult to use. However, relying on models with relatively few inputs will reduce the accuracy of the prediction results. This paper aims to develop an artificial neural network...
Saved in:
Main Authors: | Khalid S. Al-Gahtani, Abdullah M. Alsugair, Naif M. Alsanabani, Abdulmajeed A. Alabduljabbar, Abdulmohsen S. Almohsen |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2025-03-01
|
Series: | Journal of Asian Architecture and Building Engineering |
Subjects: | |
Online Access: | http://dx.doi.org/10.1080/13467581.2023.2294883 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Time Series Analysis of Daily Bed Costs and Consumption Ratio of Inpatients with CHD in a Children’s Hospital in Chengdu
by: Yang H, et al.
Published: (2025-07-01) -
Implementation of Fuzzy Time Series Markov Chain Method to Predict Electricity Consumption in Aceh Province
by: Virza Gavinda, et al.
Published: (2025-09-01) -
Forecast-Aided Converter-Based Control for Optimal Microgrid Operation in Industrial Energy Management System (EMS): A Case Study in Vietnam
by: Yeong-Nam Jeon, et al.
Published: (2025-06-01) -
Optimalisasi Prediksi Harga Ihsg Menggunakan Hybrid Weighted Fuzzy Time Series Hidden Markov Model Dengan Algoritma Evolusi Differensial
by: Alya Fitri Syalsabilla, et al.
Published: (2024-08-01) -
Trend equation prediction in medical and pharmaceutical studies (the example of respiratory diseases development in children in the region)
by: O. V. Zhukova, et al.
Published: (2017-03-01)