Technical and economic analysis of full and empty crossing methods in the sequence of station and tunnel construction in Tehran metro line seven
Due to the expansion of urban spaces and as well as the lack of necessary spaces for intra-city transportation, the need for subway construction in urban areas is more acute than ever. In order to build a subway,it is necessary to build underground structures such as tunnels and several stations.Tod...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | Persian |
Published: |
Assist. Prof. Dr. Roohollah Taherkhani
2020-11-01
|
Series: | مهندسی و مدیریت ساخت |
Subjects: | |
Online Access: | https://www.jecm.ir/article_156051_b29ab0d39055cefb9c5a08d033d1cf7b.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|