Compatibility Implementation Plan for Xi’an Metro Line 2 Phase Ⅰ and Phase Ⅱ Project Signaling Systems

[Objective] The signaling system for Xi’an Metro Line 2 Phase Ⅰ project (hereinafter referred to as Line 2) utilizes an imported system, while Phase Ⅱ adopts a domestically developed system. The Phase Ⅱ project is an extension line of Phase Ⅰ, and the signaling systems of both must be fully interope...

Full description

Saved in:
Bibliographic Details
Main Authors: SUN Hui, REN Yaping, LIANG Bo
Format: Article
Language:Chinese
Published: Urban Mass Transit Magazine Press 2025-07-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20241486.html
Tags: Add Tag
No Tags, Be the first to tag this record!