BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study
Traditional project scheduling tools like Gantt charts struggle with dynamic adjustments and real-time optimization in complex construction projects, leading to inefficiencies and delays. This study addresses this challenge by proposing a dynamic optimization framework that integrates Building Infor...
Saved in:
Main Authors: | Heap-Yih Chong, Xinyi Yang, Cheng Siew Goh, Yan Luo |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-07-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/15/14/2451 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Planning, Monitoring and Control of Mechanics Projects by the BIM
by: Alonso CANDELARIO GARRIDO, et al.
Published: (2017-03-01) -
Applications of Building Information Modeling (BIM) and BIM-Related Technologies for Sustainable Risk and Disaster Management in Buildings: A Meta-Analysis (2014–2024)
by: Jiao Wang, et al.
Published: (2025-06-01) -
Four-Dimensional Building Information Modeling (4D BIM) in Construction Project Management
by: Farzad Fani, et al.
Published: (2018-04-01) -
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims
by: Akbar Marefat, et al.
Published: (2017-11-01) -
Measuring Advantages and Challenges of Adopting BIM for Sustainable Facility Management in Iraq
by: Abbas Oleiwi Al-jaberi Karrar, et al.
Published: (2025-04-01)