Optimal schedule for extended basic period approach of economic lot scheduling problem

Most algorithms for the economic lot scheduling problem (elsp) following the extended basic period approach consist of two decision levels. On the upper level, the length of the production cycle and the number of lots (frequency) within the cycle for all products are determined. On the lower level,...

Full description

Saved in:
Bibliographic Details
Main Author: Waldemar Kaczmarczyk
Format: Article
Language:English
Published: Polish Academy of Sciences 2025-07-01
Series:Archives of Control Sciences
Subjects:
Online Access:https://journals.pan.pl/Content/135713/PDF/art01_int.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!