Optimal schedule for extended basic period approach of economic lot scheduling problem
Most algorithms for the economic lot scheduling problem (elsp) following the extended basic period approach consist of two decision levels. On the upper level, the length of the production cycle and the number of lots (frequency) within the cycle for all products are determined. On the lower level,...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2025-07-01
|
Series: | Archives of Control Sciences |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/135713/PDF/art01_int.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|