Loading…
Quality assurance and quality control for post-tensioned concrete structures /
I tiakina i:
Kaituhi rangatōpū: | |
---|---|
Hōputu: | Pukapuka |
Reo: | Ingarihi |
I whakaputaina: |
London :
T. Telford,
1986.
|
Rangatū: | FIP guide to good practice
|
Ngā marau: | |
Tags: |
Tāpirihia he Tūtohu
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a2200000u 4500 | ||
---|---|---|---|
001 | 00692964 | ||
003 | PWmBRO | ||
005 | 20240602101614.0 | ||
008 | 860512s1986 enka b 00000 eng | ||
020 | |a 0727702599 (pbk.) | ||
039 | 0 | |a 2 |b 3 |c 3 |d 3 |e 3 | |
050 | 0 | |a TA683.94 |b .Q35 1986 | |
082 | 0 | |a 624.1/83412�19 | |
090 | 0 | 0 | |a VF |b 624.183/412/F521q |
110 | 2 | 0 | |a FIP Commission on Practical Construction. |b Working Group on Quality Assurance and Quality Control for Post-tensioned Concrete Structures. |
245 | 1 | 0 | |a Quality assurance and quality control for post-tensioned concrete structures / |c prepared by the FIP Commission on Practical Construction's Working Group on Quality Assurance and Quality Control for Post-tensioned Concrete Structures. |
260 | 0 | |a London : |b T. Telford, |c 1986. | |
300 | |a 8 p. : |b ill. | ||
440 | 0 | |a FIP guide to good practice | |
650 | 0 | |a Post-tensioned prestressed concrete construction |x Quality control. | |
942 | |2 ddc | ||
952 | |0 0 |1 0 |4 0 |6 624_183412000000000_F521Q |7 0 |8 VF |9 61721 |a ML015 |b ML015 |c ML015 |d 2024-06-02 |l 0 |o 624.183412 F521q |p 064593 |r 2018-03-24 00:00:00 |w 2018-03-24 | ||
952 | |0 0 |1 0 |4 0 |6 624_183412000000000_F521Q |7 0 |8 VF |9 61722 |a ML015 |b ML015 |c VF |d 2024-06-02 |l 0 |o 624.183412 F521q |p 054818 |r 2018-03-24 00:00:00 |w 2018-03-24 |y VF | ||
992 | 0 | 2 | |a 2 copies |
994 | 0 | 2 | |a T1001 054 818 |b T1001 064 593 |
999 | |c 45273 |d 45273 |