Successful methods in cost engineering /
Saved in:
Hovedforfatter: | |
---|---|
Andre forfattere: | |
Format: | Bog |
Sprog: | engelsk |
Udgivet: |
New York :
Wiley,
1983.
|
Serier: | Construction management and engineering.
|
Fag: | |
Tags: |
Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!
|
MARC
LEADER | 00000nam a22000008a 4500 | ||
---|---|---|---|
001 | 00372307 | ||
005 | 20240602095621.0 | ||
008 | 831021s1983 nyu a o0011 eng l | ||
020 | 0 | 0 | |a 0471864358. |
035 | 0 | 0 | |a 207781060 |
082 | 0 | 0 | |a 624 |b .068 |b 1 |
100 | 1 | 0 | |a Ahuja, H. N. |
245 | 1 | 0 | |a Successful methods in cost engineering / |c Hira N. Ahuja, Michael A. Walsh. |
260 | 0 | 0 | |a New York : |b Wiley, |c 1983. |
300 | 0 | 0 | |a xv, 379 p. |
440 | 0 | 0 | |a Construction management and engineering. |
650 | 0 | 0 | |a Value analysis (Cost control). |
650 | 0 | 0 | |a Building |x Estimates. |
700 | 1 | 0 | |a Walsh, Michael A. |
942 | |2 ddc | ||
952 | |0 0 |1 0 |4 0 |6 624_068100000000000_A287 |7 0 |8 MN |9 16729 |a ML015 |b ML015 |c ML015 |d 2024-06-02 |l 0 |o 624.0681 A287 |p 013727 |r 2018-03-23 00:00:00 |w 2018-03-23 |y BK |z A | 08-07-00 | ||
952 | |0 0 |1 0 |4 0 |6 624_068100000000000_A287 |7 0 |9 16730 |a ML015 |b ML015 |c ML015 |d 2024-06-02 |l 0 |o 624.0681 A287 |p 047117 |r 2018-03-23 00:00:00 |w 2018-03-23 |z A | 08-07-00 | ||
999 | |c 11720 |d 11720 |