Torthaí cuardaigh - (( water construction ) OR ( walter consultation ))
Topaicí molta laistigh de do chuardach.
Topaicí molta laistigh de do chuardach.
- Design and construction 27
- Water 6
- Purification 5
- Handbooks, manuals, etc 4
- Sewage disposal plants 4
- Water-supply 4
- Hydraulic structures 3
- Hydroelectric power plants 3
- Storm sewers 3
- Water treatment plants 3
- Water-supply, Rural 3
- Concrete construction 2
- Environmental aspects 2
- Equipment and supplies 2
- Filtration 2
- Management 2
- Mathematical models 2
- Pipelines 2
- Sewage 2
- Silos 2
- Solar heating 2
- Solar water heaters 2
- Spillways 2
- Urban runoff 2
- Water gardens 2
- Water towers 2
- Water-pipes 2
- Water-power 2
- Water-supply engineering 2
- Addresses, essays, lectures 1
-
1
-
2
-
3
Design and construction of small water systems : a guide for managers: an AWWA small-systems resource book /
Foilsithe / Cruthaithe 1984LEABHAR -
4
Design and construction of urban stormwater management systems /
Foilsithe / Cruthaithe 1992LEABHAR -
5
Overshot waterwheel a design and construction manual
Foilsithe / Cruthaithe 1980Ábhair: “…Water-wheels Design and construction…”
LEABHAR -
6
The water gardener : a complete guide to designing, constructing and planting water features /
Foilsithe / Cruthaithe 1993LEABHAR -
7
-
8
-
9
-
10
Planning for improved enterprice performance a guide for managers and consultants
Foilsithe / Cruthaithe 1979LEABHAR -
11
Pressure pipeline design for water and wastewater /
Foilsithe / Cruthaithe 1992Ábhair: “…Water-pipes Design and construction.…”
LEABHAR -
12
Integrated design of water treatment facilities /
Foilsithe / Cruthaithe 1991Ábhair: “…Water treatment plants Design and construction.…”
LEABHAR -
13
-
14
-
15
-
16
Slow sand filtration for community water supply : planning, design, construction, operation and maintenance /
Foilsithe / Cruthaithe 1987LEABHAR -
17
Scale-up of water and wastewater treatment processes from papers presented at the First International Workshop on Scale-up of Water and Wastewater Treatment Processes held in Edmon...
Foilsithe / Cruthaithe 1983Ábhair: “…Water treatment plants Design and construction…”
LEABHAR -
18
-
19
The rehabilitation and construction of water boreholes at Mount Diamond High School /
Foilsithe / Cruthaithe 1988LEABHAR -
20
Design of networks for monitoring water quality
Foilsithe / Cruthaithe 1983Ábhair: “…Water quality monitoring stations Design and construction…”
LEABHAR