Preliminary Insulated Pipeline with Self-Compensating System of Double Pipes
The paper considers a possibility to reduce expenses while laying power-and-heat supply pipeline by using preliminary insulated self-compensating pipes. The problem of automated design of power-and-heat supply pipeline is formulated in the paper.
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2004-04-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/1127 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!