ANALYSIS OF THE TIME COURSE OF A BRIDGE ABUTMENTS SETTLEMENT
The paper deals with the time course of the bridge abutments settlement (consolidation of the subsoil) on the motorway D4 in Stupava, Slovakia. The bridge abutments are founded on an earth embankment 5.5 meters in height and a group of piles. Over 6 years of geotechnical monitoring after the constru...
Saved in:
Main Author: | Luboš Hruštinec |
---|---|
Format: | Article |
Language: | English |
Published: |
Czech Technical University in Prague
2018-06-01
|
Series: | Acta Polytechnica CTU Proceedings |
Subjects: | |
Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/4950 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Integral bridge abutment with composite dowels: structural scheme and failure patterns
by: Di Di, et al.
Published: (2025-06-01) -
Integral bridge abutment with composite dowels: structural scheme and failure patterns
by: Di Di, et al.
Published: (2025-06-01) -
Integral bridge abutment with composite dowels: structural scheme and failure patterns
by: Zhihua Xiong, et al.
Published: (2025-07-01) -
NORMATIVE INDICATORS OF DENTAL MANUFACTURING STEPS DURATION OF SCROLLABLE BRIDGES BASED ON PLASTIC BURNOUT ABUTMENTS AND ABUTMENTS WITH PLATFORM FOR BONDING RELYING ON IMPLANTS
by: E.V. Diiev, et al.
Published: (2018-03-01) -
Investigation of an abutment failure at the Naru River bridge, Madang Province /
by: King, J.
Published: (1987)