Seol mar théacs é seo: STRESSED CONDITION OF THE WRAPPING WITHOUT-DRIVE HYDROTECHNICAL TUNNEL OF THE CIRCULAR FORM, PROPOSED IN ANISOTROPIC ROCK GROUND