Model of preventive replacements of complex systems elements depending on the operation time and the number of failures
Modern conditions of economic activity of civil aviation operators make actual the problem of economically feasible measures for the organization of technical operation and maintenance of industry equipment, in particular, means of radio technical support for flights and aeronautical telecommunicati...
Saved in:
Main Authors: | V. E. Emelyanov, S. P. Matiuk |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Moscow State Technical University of Civil Aviation
2023-08-01
|
Series: | Научный вестник МГТУ ГА |
Subjects: | |
Online Access: | https://avia.mstuca.ru/jour/article/view/2220 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
PHARMACOECONOMIC ASPECTS OF THE PREVENTION OF VENOUS THROMBOEMBOLIC EVENTS AFTER LARGE JOINTS REPLACEMENT
by: A. V. Rudakova
Published: (2015-09-01) -
Long-term analysis of a series of cases of hip replacement depending on access and type of arthroplasty
by: G. Sh. Golubev, et al.
Published: (2018-06-01) -
DETERMINATION OF REPLACEMENT EFFICIENCY OF TRANSFORMERS WITH LONG SERVICE LIFE
by: M. I. Fursanov, et al.
Published: (2014-06-01) -
Risk Assessment Framework for Power Circuit Breakers Based on Condition, Replacement, and Criticality Indices
by: Suphon Kumpalavalee, et al.
Published: (2025-06-01) -
Replacing penalties
by: V. Stepashin
Published: (2017-06-01)