Monthly advance rate estimation of hard rock tunnel boring machine based on rock mass classification and data augmentation
Accurately estimating the monthly advance rate of hard rock tunnel boring machine is of great significance for construction method selection, machine type determination, and project planning. However, current researches mainly focus on estimating the advance rate during construction, and few studies...
Saved in:
Main Authors: | Honggan Yu, Yin Bo, Quansheng Liu, Xuhui Yang, Shuzhan Xu, Xing Huang |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2025-08-01
|
Series: | Underground Space |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2467967425000388 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The performance of tunnel-boring machines in rock /
by: Parkes, D. B.
Published: (1988) -
The drilling of rock /
by: McGregor, K.
Published: (1967) -
TBM Enclosure Rock Grade Prediction Method Based on Multi-Source Feature Fusion
by: Yong Huang, et al.
Published: (2025-06-01) -
Principles of rock fragmentation /
by: Clark, George Bromley, 1912-
Published: (1987) -
TIM-FEM-ML synthetic technology for longitudinal optimization of tunnel excavated in the interlayered rock mass
by: Hui Li, et al.
Published: (2025-08-01)