Corrosion protection challenges for Australia’s longest single-lane bridge in a harsh marine environment

The Mission River Bridge in Weipa, Queensland, is Australia’s longest single-lane bridge spanning 1040 meters. Built in 1971 with a 35-year design life, the bridge plays a key role in supporting the region’s mining operations and its local communities. Over time, its steel piles have suffered signif...

Full description

Saved in:
Bibliographic Details
Main Authors: Cheaitani Atef, Brown Bob, Lamperd Rhett
Format: Article
Language:English
Published: EDP Sciences 2025-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2025/03/matecconf_cs2025_04001.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!