Corrosion protection challenges for Australia’s longest single-lane bridge in a harsh marine environment
The Mission River Bridge in Weipa, Queensland, is Australia’s longest single-lane bridge spanning 1040 meters. Built in 1971 with a 35-year design life, the bridge plays a key role in supporting the region’s mining operations and its local communities. Over time, its steel piles have suffered signif...
Saved in:
Main Authors: | Cheaitani Atef, Brown Bob, Lamperd Rhett |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2025-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2025/03/matecconf_cs2025_04001.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Assessment of the performance of ICCP, hybrid anode and sacrificial anode systems operating on concrete bridges and structures in NSW, Australia based on potential criteria
by: Fatemi Hamid, et al.
Published: (2025-01-01) -
The longest race
by: Roth, Hal
Published: (1983) -
The longest journey /
by: Forster, E. M.
Published: (1992) -
Deterioration behavior of aged magnetorheological elastomer under harsh marine environment
by: Nursyafiqah Zaini, et al.
Published: (2024-07-01) -
The longest day : June 6, 1944 /
by: Ryan, Cornelius
Published: (1959)