Study on the Support Pressure of Tunnel Face for the Construction of Pipe-Jacking Across Thin Overburden River Channel Based on Mud-Water Balance

Pipe-jacking construction technology is favored in urban construction due to its advantages of high safety and being a non-excavation technique. However, instability of the tunnel face often occurs due to unfavorable conditions, such as pipe jacking across the river channel, shallow soil cover, and...

Full description

Saved in:
Bibliographic Details
Main Authors: Ziguang Zhang, Wanyu Li, Jie Sheng, Biao Leng, Mengqing Zhang
Format: Article
Language:English
Published: MDPI AG 2025-06-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/15/13/7060
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Pipe-jacking construction technology is favored in urban construction due to its advantages of high safety and being a non-excavation technique. However, instability of the tunnel face often occurs due to unfavorable conditions, such as pipe jacking across the river channel, shallow soil cover, and improper control of the support pressure. In this study, we made a use of the limit balance method and mud–water balance theory. At this moment of passive damage and active destruction occurring at the pipe-jacking tunnel face, the general mathematical expressions of the tunnel-face support pressure (with lower limit value P<sub>min</sub> and upper limit value P<sub>max</sub>) are derived. In the non-river impact area and river impact area, the optimal value P<sub>o</sub> of support pressure at the tunnel face is thus derived. Then, based on the Y25-Y26 pipe-jacking project across the Chu River channel in Hefei North District, a numerical simulation method is used to support further discussion. The results indicate that, when the river overburden is 3 m, the ultimate support pressure calculated by means of numerical simulation is 881.786 kN, and the optimal support ratio <inline-formula><math xmlns="http://www.w3.org/1998/Math/MathML" display="inline"><semantics><mrow><mi mathvariant="sans-serif">λ</mi></mrow></semantics></math></inline-formula> is taken in the interval of 1.0~1.5. Secondly, the upper limit value P<sub>max</sub>, lower limit value P<sub>min</sub>, and optimum value P<sub>o</sub> calculated using the theoretical equations are 2669.977 kN, 309.910 kN, and 1044.870 kN, respectively. These results leads us to recommend setting the support pressure of the tunnel face in a reasonable range between the upper limit value P<sub>max</sub> and the lower limit value P<sub>min</sub>, to ensure that the tunnel-face support pressure and resistance during pipe jacking always remain in a balanced state. The relevant research results from this study provide an important technical guarantee for the successful implementation of the examined project and, at the same time, can serve as a reference example for similar projects.
ISSN:2076-3417