Energy Optimisation of Industrial Limestone Grinding Using ANN
This paper presents methods for modelling and optimising the industrial limestone grinding process carried out using a real limestone plant. Two key process evaluation indicators were developed: specific electric energy consumption and an extended indicator that also includes gas usage. Using proces...
Saved in:
Main Authors: | Dagmara Kołodziej, Patryk Bałazy, Paweł Knap, Krzysztof Lalik, Damian Krawczykowski |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-07-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/15/14/7702 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An introduction to unconstrained optimisation /
by: McKeown, J. J.
Published: (1990) -
Optimisation Models for Inventory Management with Limited Number of Stock Items
by: Julian Vasilev, et al.
Published: (2022-08-01) -
Reliability‐based hull geometry optimisation of a point‐absorber wave energy converter with power take‐off structural reliability objectives
by: Anna Garcia‐Teruel, et al.
Published: (2021-10-01) -
Artificial Intelligence overview for optimizing production scheduling in a picture framing company
by: Krupnik-Worek Jadwiga, et al.
Published: (2025-01-01) -
Waste Collection Optimisation: A Path to a Green and Sustainable City of Makkah
by: Haneen Algethami, et al.
Published: (2023-08-01)