Studies of Reliability of Power Supply of the Enterprise from the Electric Power System and Autonomous Loaded Generators Based on Markov Processes
The purpose of this work is to substantiate the use of probabilistic components of the availabil-ity factor of the power supply system (PSS) of the enterprise consisting of a electric power sys-tem and autonomous loaded generators, to calculate overpayments for electricity. To achieve this purpose,...
Saved in:
Main Authors: | Basmanov V.G., Kholmanskikh V.M., Suntsov K.A. |
---|---|
Format: | Article |
Language: | English |
Published: |
Academy of Sciences of Moldova
2024-11-01
|
Series: | Problems of the Regional Energetics |
Subjects: | |
Online Access: | https://journal.ie.asm.md/assets/files/16_04_64_2024.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluation of the Idle time of Single-Chain and Double-Chain Overhead Power Lines of 6–10 kV by Methods of Queuing Theory
by: Basmanov V.G., et al.
Published: (2022-11-01) -
Selection of Frequency Estimation of 6-10 kV-Overhead Lines’ Technical Condition Based on Reliability Statistical Studies
by: Basmanov V.G., et al.
Published: (2020-12-01) -
Features of Forecasting Reliability of 6—10 kV Overhead Lines According to Statistics of their Failures and Reconditionings
by: Basmanov V.G.
Published: (2021-11-01) -
Location and Parameters of Power System Stabilizer for Small Perturbation of Tunisian Network
by: Rim Ben Salah, et al.
Published: (2015-08-01) -
Pengembangan Sistem Pengukuran Tingkat Stres Menggunakan Sensor GSR dengan Perbandingan Metode PSS
by: Rechi Yudha Apza, et al.
Published: (2025-04-01)