Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method

Introduction. During the development of gas condensate deposits for depletion, with a decrease in reservoir pressure, condensate falls out in the bottomhole zone of wells (BWZ) and a zone with increased condensate saturation is formed.Materials and methods of research. The considered method of non-s...

Full description

Saved in:
Bibliographic Details
Main Author: V. V. Inyakin
Format: Article
Language:Russian
Published: North-Caucasus Federal University 2023-06-01
Series:Наука. Инновации. Технологии
Subjects:
Online Access:https://scienceit.elpub.ru/jour/article/view/625
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1839591694771683328
author V. V. Inyakin
author_facet V. V. Inyakin
author_sort V. V. Inyakin
collection DOAJ
description Introduction. During the development of gas condensate deposits for depletion, with a decrease in reservoir pressure, condensate falls out in the bottomhole zone of wells (BWZ) and a zone with increased condensate saturation is formed.Materials and methods of research. The considered method of non-stationary operating mode was justified by the example of the development of the Achimov deposits of the Urengoyskoye field using the tNavigator software package.Research results and their discussion. The work studies a method of periodical shutting down a gas condensate well in order to increase the additional recovery of retrograde condensate from the reservoir. The optimal well shutdown period is substantiated through the use of hydrodynamic modeling. The paper also analyzes the factors aimed at maintaining the maximum effect from the periodic operation of the well, the main of which is the mode of operation after the well is launched. The considered method of non-stationary operating mode was justified by the example of the development of the Achimov deposits of the Urengoyskoye field using the tNavigator software package. The initial information for modeling was the following: monthly operational reports (MER); results of gas condensate studies; downhole and wellhead measurement data.Conclusion. Based on the studies performed to determine the optimal duration of well shutdown during the development of the Achimov deposits of the Urengoyskoye field, it was revealed that the shutdown duration (more than 183 days) will have a negative impact on the potential condensate content in the formation gas. It has been substantiated that the efficiency of periodic shutdowns is affected by the technological mode of well operation after start-up. Also, the drawdown reduction makes it possible to preserve the effect of the reverse dissolution of condensate through the use of the natural energy of the reservoir.
format Article
id doaj-art-a1f22a3c9a6940a8a825ec1a61264c25
institution Matheson Library
issn 2308-4758
language Russian
publishDate 2023-06-01
publisher North-Caucasus Federal University
record_format Article
series Наука. Инновации. Технологии
spelling doaj-art-a1f22a3c9a6940a8a825ec1a61264c252025-08-03T13:00:03ZrusNorth-Caucasus Federal UniversityНаука. Инновации. Технологии2308-47582023-06-010221323110.37493/2308-4758.2023.2.9619Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns MethodV. V. Inyakin0Tyumen Industrial UniversityIntroduction. During the development of gas condensate deposits for depletion, with a decrease in reservoir pressure, condensate falls out in the bottomhole zone of wells (BWZ) and a zone with increased condensate saturation is formed.Materials and methods of research. The considered method of non-stationary operating mode was justified by the example of the development of the Achimov deposits of the Urengoyskoye field using the tNavigator software package.Research results and their discussion. The work studies a method of periodical shutting down a gas condensate well in order to increase the additional recovery of retrograde condensate from the reservoir. The optimal well shutdown period is substantiated through the use of hydrodynamic modeling. The paper also analyzes the factors aimed at maintaining the maximum effect from the periodic operation of the well, the main of which is the mode of operation after the well is launched. The considered method of non-stationary operating mode was justified by the example of the development of the Achimov deposits of the Urengoyskoye field using the tNavigator software package. The initial information for modeling was the following: monthly operational reports (MER); results of gas condensate studies; downhole and wellhead measurement data.Conclusion. Based on the studies performed to determine the optimal duration of well shutdown during the development of the Achimov deposits of the Urengoyskoye field, it was revealed that the shutdown duration (more than 183 days) will have a negative impact on the potential condensate content in the formation gas. It has been substantiated that the efficiency of periodic shutdowns is affected by the technological mode of well operation after start-up. Also, the drawdown reduction makes it possible to preserve the effect of the reverse dissolution of condensate through the use of the natural energy of the reservoir.https://scienceit.elpub.ru/jour/article/view/625potential content of condensate in reservoir gascondensate recovery factornon-stationary well operationgas condensate system
spellingShingle V. V. Inyakin
Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method
Наука. Инновации. Технологии
potential content of condensate in reservoir gas
condensate recovery factor
non-stationary well operation
gas condensate system
title Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method
title_full Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method
title_fullStr Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method
title_full_unstemmed Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method
title_short Production Enhancement of Condensate Reserves By Рeriodic Well Shutdowns Method
title_sort production enhancement of condensate reserves by рeriodic well shutdowns method
topic potential content of condensate in reservoir gas
condensate recovery factor
non-stationary well operation
gas condensate system
url https://scienceit.elpub.ru/jour/article/view/625
work_keys_str_mv AT vvinyakin productionenhancementofcondensatereservesbyreriodicwellshutdownsmethod