Determination of the inter-repair cycle of production boreholes for underground uranium leaching
Introduction. The operation of technological wells for underground leaching of metals inevitably leads to a decrease in their design productivity, which is accompanied by an increase in the development time of deposits. This paper shows the impact of the timeliness of repair and restoration work on...
Saved in:
Main Authors: | Yu. А. Arsentiev, A. P. Nazarov, N. V. Soloviev, D. А. Ivanov, А. G. Ivanov |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Sergo Ordzhonikidze Russian State University for Geological Prospecting
2024-05-01
|
Series: | Известия высших учебных заведений: Геология и разведка |
Subjects: | |
Online Access: | https://www.geology-mgri.ru/jour/article/view/1009 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Features of mechanical pulse treatment of filters and near-filter zones of in-situ uranium leaching wells
by: A. G. Ivanov, et al.
Published: (2025-04-01) -
Nuclear assaying of mining boreholes : an introduction /
by: Wylie, A. W.
Published: (1984) -
Safety in wells and boreholes
Published: (1972) -
Borehole Azimuth Correction Method Considering the Effect of Underground Magnetic Veins
by: Gui HU, et al.
Published: (2025-04-01) -
Modeling the performance indicators of geotechnological blocks and the movement of the discovered reserves of an underground borehole leaching of uranium
by: D. R. Podrezov
Published: (2020-08-01)