Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
In this study, contractor’s claim and its management in in turnkey contracts according to FIDIC has been discussed through library studies and surveys among experienced specialists in international civil projects and then this discussion has been developed with benefit of modeling the claim using sy...
Saved in:
Main Authors: | Amir Momeni, Elham Rastar, Armin Monirabbasi |
---|---|
Format: | Article |
Language: | Persian |
Published: |
Assist. Prof. Dr. Roohollah Taherkhani
2019-02-01
|
Series: | مهندسی و مدیریت ساخت |
Subjects: | |
Online Access: | https://www.jecm.ir/article_103639_bdd16ef4b00dcd5ba905f88f582d4c03.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Management of contractor's claim in Turnkey projects according to FIDIC under termination and dissolution of contract
by: Amir Momeni, et al.
Published: (2019-02-01) -
Applicable law for construction contracts under FIDIC general conditions: The role of chosen law
by: Jovanović Stefan M.
Published: (2025-01-01) -
Increasing human resource management productivity in construction projects based on PMBOK
by: Hossein Ghorbani, et al.
Published: (2020-05-01) -
Patterns of claims and determinants of claim rejections in Kuwait's National Health Insurance for Retirees (AFYA): a comprehensive analysis
by: Abdullah I. Alibrahim, et al.
Published: (2025-07-01) -
SMALL CLAIM AND SUMMARY PROCEDURE IN CHINA
by: Yulin Fu
Published: (2016-06-01)