LEO-Enhanced BDS-3 PPP Performance Based on B2b Signal
Since 2020, the BDS-3 has been providing real-time corrections via the B2b signal, enabling users in China and its neighboring regions to achieve kinematic positioning accuracy at the decimeter level. The rapid geometric changes of Low-Earth-Orbit (LEO) satellites facilitate the rapid resolution of...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-06-01
|
Series: | Remote Sensing |
Subjects: | |
Online Access: | https://www.mdpi.com/2072-4292/17/13/2183 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Since 2020, the BDS-3 has been providing real-time corrections via the B2b signal, enabling users in China and its neighboring regions to achieve kinematic positioning accuracy at the decimeter level. The rapid geometric changes of Low-Earth-Orbit (LEO) satellites facilitate the rapid resolution of phase ambiguities and accelerate the convergence of Precise Point Positioning (PPP). Therefore, this study proposes an LEO-enhanced BDS-3 PPP-B2b positioning model. Firstly, a novel BDS-3 PPP model accounting for satellite clock bias characteristics is proposed, and experimental validation confirms its efficacy. Subsequently, an LEO-enhanced BDS-3 PPP model is developed. Finally, the positioning performance is rigorously evaluated using combined LEO simulation observations and BDS-3 observations. The results indicate that, compared with the traditional PPP model, the new model yields an average convergence time of 25.1 min for experiments where the convergence criterion is jointly satisfied, representing a 35.6% improvement in convergence speed, while maintaining the same positioning accuracy after convergence. When augmented with LEO satellites, the convergence time of the BDS-3 PPP-B2b solution is reduced to less than 2 min. Furthermore, when more than three LEO satellites are available, the mean convergence time is shortened to within 1 min. |
---|---|
ISSN: | 2072-4292 |