THE PROBLEM OF ENSURING UNINTERRUPTED EXPLOITATION OF WELLS ON THE FIELDS AT THE LATE STAGE OF OPERATION
The design of a ramjet wellhead choke, with automatic cleaning throttle channel, which can set in the axial channel of pipe at the wellhead. When the differential pressure increase, which occurs in the case of the axial channel nozzle clogging with mechanical impurities or gas hydrates, automaticall...
Saved in:
Main Authors: | Yulianna O. Sizova, Sergey A. Parosochenko, Alexey N. Grab |
---|---|
Format: | Article |
Language: | Russian |
Published: |
North Caucasus Federal University
2022-05-01
|
Series: | Вестник Северо-Кавказского федерального университета |
Subjects: | |
Online Access: | https://vestnikskfu.elpub.ru/jour/article/view/2036 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
AVIATION FUEL SEDIMENTATION DURATION FIXED STANDARD ACCURACY PROBLEMS
by: E. A. Konyaev, et al.
Published: (2016-11-01) -
Lateral bearing characteristics of subsea wellhead assembly in the hydrate trial production engineering
by: Jing Zeng, et al.
Published: (2023-07-01) -
ACTIVITIES TO INCREASE THE EFFICIENCY OF PERIODICALS ARTIFICIAL WELLS
by: Alena Olegovna Shesteren
Published: (2022-09-01) -
COMPARATIVE ASSESSMENT OF EFFECT OF COMBINED DRUGS OF ACE INHIBITOR AND DIURETIC (“NOLIPREL FORTE” AND “CAPOZIDE”) ON CARDIOVASCULAR REMODELING IN HYPERTENSIVE PATIENTS
by: T. D. Kaplanov, et al.
Published: (2015-12-01) -
Применение оптимизационных задач в планировании работы грузового автотранспортного предприятия
by: Ludmila Semenovna Trofimova, et al.
Published: (2017-08-01)