SOIL LAYER CUT OFF BY THE AGGREGATE FOR REMOVING THE TOPSOIL FROM THE ROAD SUBLAYER: DETERMINATION OF THE CHAIN SPEED AND SIZES

Introduction. For the durable road at the minimum necessary cost of its construction the topsoil should be removed without affecting the ground. The problem of cheaper road construction without reducing the quality can be solved by creating an aggregate for the sublayer’s formation. The aggregate re...

Full description

Saved in:
Bibliographic Details
Main Author: V. A. Nikolaev
Format: Article
Language:Russian
Published: Siberian State Automobile and Highway University 2020-03-01
Series:Вестник СибАДИ
Subjects:
Online Access:https://vestnik.sibadi.org/jour/article/view/1022
Tags: Add Tag
No Tags, Be the first to tag this record!