Beyond Kanban: POLCA-Constrained Scheduling for Job Shops

This study investigates the integration of finite capacity scheduling with POLCA-based workload control in high-mix, low-volume production environments. We propose a proactive scheduling approach that embeds POLCA constraints into a constraint programming (CP) model, aiming to reconcile the trade-of...

Full description

Saved in:
Bibliographic Details
Main Authors: Antonio Grieco, Pierpaolo Caricato, Paolo Margiotta
Format: Article
Language:English
Published: MDPI AG 2025-06-01
Series:Algorithms
Subjects:
Online Access:https://www.mdpi.com/1999-4893/18/6/340
Tags: Add Tag
No Tags, Be the first to tag this record!