Beyond Kanban: POLCA-Constrained Scheduling for Job Shops
This study investigates the integration of finite capacity scheduling with POLCA-based workload control in high-mix, low-volume production environments. We propose a proactive scheduling approach that embeds POLCA constraints into a constraint programming (CP) model, aiming to reconcile the trade-of...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-06-01
|
Series: | Algorithms |
Subjects: | |
Online Access: | https://www.mdpi.com/1999-4893/18/6/340 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|