High in-situ stress evaluation and disaster case analysis for the Sichuan–Tibet railway
Objective The challenges posed by high in-situ stress along the newly constructed Sichuan–Tibet railway are significant, characterized by frequent catastrophic events such as rock bursts and large deformations in soft rocks, which substantially impact tunnel construction for the Sichuan–Tibet railw...
Saved in:
Main Authors: | DAI Xiangqian, WANG Chenghu, GAO Guiyun, YANG Xinshuai, LIU Jikun |
---|---|
Format: | Article |
Language: | Chinese |
Published: |
Institute of Geomechanics, Chinese Academy of Geological Sciences
2025-05-01
|
Series: | Dizhi lixue xuebao |
Subjects: | |
Online Access: | https://journal.geomech.ac.cn//article/doi/10.12090/j.issn.1006-6616.2025021 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Potential seismic landslide hazard and engineering effect in the Ya’an-Linzhi section of the Sichuan-Tibet transportation corridor, China
by: Zhi-hua Yang, et al.
Published: (2023-04-01) -
Geological risk assessment of traffic engineering construction among 7.0–8.5 magnitude earthquake areas: Practice from the Sichuan-Tibet transport corridor in the eastern Tibetan Plateau
by: Ning Zhong, et al.
Published: (2024-10-01) -
Magic and mystery in Tibet /
by: David-Neel, Alexandra, 1868-1969
Published: (1967) -
Spatiotemporal Variations in Human Activity Intensity Along the Qinghai–Tibet Railway and Analysis of Its Decoupling Process from Ecological Environment Quality Changes
by: Fengli Zou, et al.
Published: (2025-06-01) -
Differential diagenetic evolution of Sinian Dengying Formation reservoirs in Anyue gas field, Central Sichuan Uplift, Sichuan Basin
by: Chengyu YANG, et al.
Published: (2025-07-01)