Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt
From reliability, maintainability, and availability (RAM) points of view, the performance of power transformers has a significant impacts on the performance of the entire power network. Their performance has also a significant impacts on the power interruptions at various voltage levels and the cons...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Academy Publishing Center
2019-12-01
|
Series: | Renewable Energy and Sustainable Development |
Subjects: | |
Online Access: | http://apc.aast.edu/ojs/index.php/RESD/article/view/299 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1839635282923618304 |
---|---|
author | Ahmed Adel EL-Bassiouny Mohamed EL-Shimy Rizk Hamouda |
author_facet | Ahmed Adel EL-Bassiouny Mohamed EL-Shimy Rizk Hamouda |
author_sort | Ahmed Adel EL-Bassiouny |
collection | DOAJ |
description | From reliability, maintainability, and availability (RAM) points of view, the performance of power transformers has a significant impacts on the performance of the entire power network. Their performance has also a significant impacts on the power interruptions at various voltage levels and the consequent customer interruption costs. This paper will discuss the estimated remaining lifetime of power transformers in the voltages subpopulations: 500kV, 220 kV, 132 kV, 66kV and 33 kV of the Egyptian grid as time between failures (TBFs) will be determined and then determine the best fit probability distribution using MATLAB program for repair time, customer interruption costs (CIC) and TBFs, this is performed in order to estimate remaining lifetime of the transformers, from which the best fit probability distribution will be used in this case study which is Weibull distribution. Finally availability of the transformers per different voltage populations is calculated and determined. Different subassemblies (failures) are also undergo the same process of determining TBFs and estimating remaining lifetime. The results will be helpful in the manufacturing process of the transformers and enhancing the maintenance schedule. <strong> </strong> |
format | Article |
id | doaj-art-4bccd813cb634ec3b5f9adb93fca25aa |
institution | Matheson Library |
issn | 2356-8518 2356-8569 |
language | English |
publishDate | 2019-12-01 |
publisher | Academy Publishing Center |
record_format | Article |
series | Renewable Energy and Sustainable Development |
spelling | doaj-art-4bccd813cb634ec3b5f9adb93fca25aa2025-07-09T10:32:33ZengAcademy Publishing CenterRenewable Energy and Sustainable Development2356-85182356-85692019-12-0152465610.21622/resd.2019.05.2.046141Probabilistic Analysis of the Reliability Performance for Power Transformers in EgyptAhmed Adel EL-Bassiouny0Mohamed EL-Shimy1Rizk Hamouda2Salah Shaaban Consulting OfficeElectrical power and machines department, Faulty of Engineering, Ain Shams University, Cairo, Egypt.3Energy Engineering, Faulty of Engineering, Heliopolis University, Cairo, EgyptFrom reliability, maintainability, and availability (RAM) points of view, the performance of power transformers has a significant impacts on the performance of the entire power network. Their performance has also a significant impacts on the power interruptions at various voltage levels and the consequent customer interruption costs. This paper will discuss the estimated remaining lifetime of power transformers in the voltages subpopulations: 500kV, 220 kV, 132 kV, 66kV and 33 kV of the Egyptian grid as time between failures (TBFs) will be determined and then determine the best fit probability distribution using MATLAB program for repair time, customer interruption costs (CIC) and TBFs, this is performed in order to estimate remaining lifetime of the transformers, from which the best fit probability distribution will be used in this case study which is Weibull distribution. Finally availability of the transformers per different voltage populations is calculated and determined. Different subassemblies (failures) are also undergo the same process of determining TBFs and estimating remaining lifetime. The results will be helpful in the manufacturing process of the transformers and enhancing the maintenance schedule. <strong> </strong>http://apc.aast.edu/ojs/index.php/RESD/article/view/299“transformers”, “weibull distribution”, “remaining lifetime”, “availability” |
spellingShingle | Ahmed Adel EL-Bassiouny Mohamed EL-Shimy Rizk Hamouda Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt Renewable Energy and Sustainable Development “transformers”, “weibull distribution”, “remaining lifetime”, “availability” |
title | Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt |
title_full | Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt |
title_fullStr | Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt |
title_full_unstemmed | Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt |
title_short | Probabilistic Analysis of the Reliability Performance for Power Transformers in Egypt |
title_sort | probabilistic analysis of the reliability performance for power transformers in egypt |
topic | “transformers”, “weibull distribution”, “remaining lifetime”, “availability” |
url | http://apc.aast.edu/ojs/index.php/RESD/article/view/299 |
work_keys_str_mv | AT ahmedadelelbassiouny probabilisticanalysisofthereliabilityperformanceforpowertransformersinegypt AT mohamedelshimy probabilisticanalysisofthereliabilityperformanceforpowertransformersinegypt AT rizkhamouda probabilisticanalysisofthereliabilityperformanceforpowertransformersinegypt |