Setting of conditions for handling electric multiple units “Lastochka”
In 2013, JSC “Russian Railways” railway network was put into operation high-speed electric multiple unit (EMU) ES1 “Lastochka” of dual supply with asynchronous traction drive produced by Siemens on Desiro platform. In accordance with the requirements of safety standards, and later the Technical Regu...
Saved in:
Main Authors: | A. M. Brzezhovskiy, D. N. Arshintsev, I. V. Smelyanskiy, S. V. Tolmachev, D. E. Kiryushin |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Joint Stock Company «Railway Scientific and Research Institute»
2016-08-01
|
Series: | Вестник Научно-исследовательского института железнодорожного транспорта |
Subjects: | |
Online Access: | https://www.journal-vniizht.ru/jour/article/view/105 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Impact on the track from EMU commuter train
by: A. M. Brzhezovskiy
Published: (2018-08-01) -
Results of observations to evaluate the impact of operational factors on the side rail wear
by: V. O. Pevzner, et al.
Published: (2016-08-01) -
Experimental apparatus for measurement of photoneutrons from linear accelerator with energy of 16 MeV
by: Marcelo Vilela da Silva, et al.
Published: (2021-09-01) -
Possibilities of high-speed railway turnout data description
by: Adam Hlubuček
Published: (2021-07-01) -
Estimation of the stability of barley regenerated lines within the current breeding process
by: S. Yu. Lugovtsova, et al.
Published: (2022-11-01)