Evaluating the behavior of the Balaroud earth fill dam during impoundment in the final construction stage
Increased demand for freshwater and climate change effects have shifted focus to water resource management, highlighting the crucial role of dams in addressing supply and demand challenges. One of the primary challenges associated with newly constructed dams is effectively monitoring them during the...
Saved in:
Main Authors: | Soroush Esmaeili-zadeh, Babak Lashkar-Ara |
---|---|
Format: | Article |
Language: | English |
Published: |
Razi University
2025-06-01
|
Series: | Journal of Applied Research in Water and Wastewater |
Subjects: | |
Online Access: | https://arww.razi.ac.ir/article_3758_48398e75522a1afe2b00878ca68eb4d5.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Scheduling strategies of cascade reservoirs under extreme drought conditions during the impoundment period: A case study of lower Jinsha River, China
by: Rongqi Zhang, et al.
Published: (2025-08-01) -
Seepage and leakage from dams and impoundments : proceedings of a symposium sponsored by the Geotechnical Engineering Division in conjunction with the ASCE National Convention, Denver, Colorado, May 5, 1985 /
Published: (1985) -
Dams, dam foundations, and reservoir sites /
by: Wahlstrom, Ernest E.
Published: (1974) -
Induced seismicity by impoundment or hydraulic fracturing operation? A case study in the Xiannvshan Fault area of the Three Gorges Reservoir region
by: Guangqin Tong, et al.
Published: (2025-06-01) -
Big dam foolishness : the problem of modern flood control and water storage /
by: Peterson, Elmer T.
Published: (1954)