Service Restoration in Distribution Networks by Optimal Scheduling of Repair Crew and Mobile Power Sources
Power distribution utilities need to have an effective and suitable service restoration (SR) plan to reconnect customers quickly after power outages. This article presents a heuristic bi-stage SR algorithm that first re-energizes some of the loads fast by remote-controlled switches (RCSs) in the fir...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Amirkabir University of Technology
2024-03-01
|
Series: | AUT Journal of Electrical Engineering |
Subjects: | |
Online Access: | https://eej.aut.ac.ir/article_5352_efd07e18eb18579bd5fc382344b381d6.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|