Integrated Process Planning and Scheduling and Multimode Resource Constrained Project Scheduling: Ship Block Assembly Application
None
Saved in:
| Main Author: | Qassim, Raad Yahya |
|---|---|
| Format: | Electronic Book Chapter |
| Language: | English |
| Published: |
IntechOpen
2012
|
| Subjects: | |
| Online Access: | https://www.intechopen.com/chapters/36416 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Staff Hiring and Reassignment Based on Resource-Constrained Project Scheduling
by: Giannis Savva, et al.
Published: (2025-01-01) -
An enhanced tabu search algorithm for resource-constrained project scheduling with a flexible project structure
by: Chunlai Yu, et al.
Published: (2025-12-01) -
Project scheduling with limited resources
by: Kiana Ahghari
Published: (2020-05-01) -
Learning-Enhanced Differential Evolution for Multi-Mode Resource-Constrained Multi-Project Scheduling Problem in Industrial Prefabrication
by: Zijie Xing, et al.
Published: (2025-06-01) -
Beyond Kanban: POLCA-Constrained Scheduling for Job Shops
by: Antonio Grieco, et al.
Published: (2025-06-01)


