The Gap Measurement Technology and Advanced RVI Installation Method for Construction Period Reduction of a PWR
None
Saved in:
Main Author: | Ko, Do-Young |
---|---|
Format: | Electronic Book Chapter |
Language: | English |
Published: |
IntechOpen
2012
|
Subjects: | |
Online Access: | https://www.intechopen.com/chapters/33369 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Periodic Inspection Program of Nuclear PWR reactor Pressure Vessel
by: Anne Aguiar Araujo
Published: (2021-02-01) -
Features of organizational and technological solutions for the construction and installation of large-span buildings
by: Tatyana K. Kuzmina, et al.
Published: (2025-06-01) -
Effect of Corrosion of the Fuel Rod Construction Materials on the Radiation Safety of Nuclear Power Plants with PWR
by: V. V. Kravchenko, et al.
Published: (2020-02-01) -
Electrical installation technology
by: Neidle, Michael
Published: (1975) -
Electrical installation technology /
by: Neidle, Michael
Published: (1978)