Ko, D. (2012). The Gap Measurement Technology and Advanced RVI Installation Method for Construction Period Reduction of a PWR. IntechOpen. https://doi.org/10.5772/33531
Chicago Style (17th ed.) CitationKo, Do-Young. The Gap Measurement Technology and Advanced RVI Installation Method for Construction Period Reduction of a PWR. IntechOpen, 2012. https://doi.org/10.5772/33531.
MLA (9th ed.) CitationKo, Do-Young. The Gap Measurement Technology and Advanced RVI Installation Method for Construction Period Reduction of a PWR. IntechOpen, 2012. https://doi.org/10.5772/33531.
Warning: These citations may not always be 100% accurate.