Hatefi, M. A., Vahhabi, M. M., & Sobhi, G. A. (2011). Selection of the Desirable Project Roadmap Scheme, Using the Overall Project Risk (OPR) Concept. IntechOpen. https://doi.org/10.5772/16715
Chicago Style (17th ed.) CitationHatefi, Mohammad Ali, Mohammad Mehdi Vahhabi, and Ghorban Ali Sobhi. Selection of the Desirable Project Roadmap Scheme, Using the Overall Project Risk (OPR) Concept. IntechOpen, 2011. https://doi.org/10.5772/16715.
MLA (9th ed.) CitationHatefi, Mohammad Ali, et al. Selection of the Desirable Project Roadmap Scheme, Using the Overall Project Risk (OPR) Concept. IntechOpen, 2011. https://doi.org/10.5772/16715.
Warning: These citations may not always be 100% accurate.