Kain, S., Schiller, F., & Dominka, S. (2011). Methodology for Reusing Real-time HiL Simulation Models in the Commissioning and Operation Phase of Industrial Production Plants. IntechOpen. https://doi.org/10.5772/14673
Chicago Style (17th ed.) CitationKain, Sebastian, Frank Schiller, and Sven Dominka. Methodology for Reusing Real-time HiL Simulation Models in the Commissioning and Operation Phase of Industrial Production Plants. IntechOpen, 2011. https://doi.org/10.5772/14673.
MLA (9th ed.) CitationKain, Sebastian, et al. Methodology for Reusing Real-time HiL Simulation Models in the Commissioning and Operation Phase of Industrial Production Plants. IntechOpen, 2011. https://doi.org/10.5772/14673.
Warning: These citations may not always be 100% accurate.