Well point dewatering of phosphatic clays /
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Book |
| Language: | English |
| Published: |
Washington, D.C. :
U.S. Dept. of the Interior, Bureau ofMines,
1989.
|
| Series: | Report of investigations (United States. Bureau of Mines);
9285. |
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
| LEADER | 00000nam a2200000u 4500 | ||
|---|---|---|---|
| 001 | 00906204 | ||
| 003 | PWmBRO | ||
| 005 | 20240602102127.0 | ||
| 008 | 890717s1989 dcua b f00010 eng | ||
| 010 | |a 90055048 | ||
| 090 | 0 | |a VF |b 661.4/3/S644w | |
| 100 | 1 | 0 | |a Smith, C. W. |q (Carl W.) |
| 245 | 1 | 0 | |a Well point dewatering of phosphatic clays / |c by C.W. Smith and J.T. McLendon. |
| 260 | 0 | |a Washington, D.C. : |b U.S. Dept. of the Interior, Bureau ofMines, |c 1989. | |
| 300 | |a 11 p. : |b ill. | ||
| 490 | 1 | |a Report of investigations ; |v 9285 | |
| 650 | 0 | |a Phosphate industry |x Waste disposal. | |
| 650 | 0 | |a Clay wastes |x Dewatering. | |
| 650 | 0 | |a Well points. | |
| 700 | 1 | 0 | |a McLendon, Jerry T. |
| 830 | 0 | |a Report of investigations (United States. Bureau of Mines); |v 9285. | |
| 942 | |2 ddc | ||
| 994 | 0 | 1 | |a 076734 |
| 999 | |c 53961 |d 53961 | ||
| 952 | |0 0 |1 0 |4 0 |7 0 |8 VF |a ML015 |b ML015 |c VF |d 2024-06-02 |l 0 |o 661.43 S644w |p 076734 |r 2018-03-24 00:00:00 |w 2018-03-24 |y VF | ||