Producing synthetic rutile from ilmenite by pyrometallurgy : pilot-plant studies and economic evaluation /
Saved in:
| Main Author: | |
|---|---|
| Corporate Author: | |
| Other Authors: | , |
| Format: | Unknown |
| Language: | English |
| Published: |
Washington, D.C. :
U.S. Dept. of the Interior, Bureau of Mines,
1796.
|
| Series: | Report of investigations (United States. Bureau of Mines) ;
8140. |
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
| LEADER | 00000n a2200000 4500 | ||
|---|---|---|---|
| 001 | 00945609 | ||
| 003 | PWmBRO | ||
| 005 | 20240602102337.0 | ||
| 008 | 910826s1976 dcua f 010 eng | ||
| 010 | |a 91055073 | ||
| 090 | 0 | |a VF |b 622.0/6173/E41p | |
| 100 | 1 | 0 | |a Elger, G. W. |
| 245 | 1 | 0 | |a Producing synthetic rutile from ilmenite by pyrometallurgy : |b pilot-plant studies and economic evaluation / |c by G.W. Elger, D.E. Kirby and S.C. Rhoads. |
| 260 | 0 | |a Washington, D.C. : |b U.S. Dept. of the Interior, Bureau of Mines, |c 1796. | |
| 300 | |a 31 p. : |b ill. | ||
| 490 | 1 | |a Report of investigations ; |v 8140. | |
| 650 | 0 | |a Rutile. | |
| 650 | 0 | |a Ilmenite. | |
| 700 | 1 | 0 | |a Kirby, D. E. |
| 700 | 1 | 0 | |a Rhoads, S. C. |
| 710 | 2 | 0 | |a United States. |b Bureau of Mines. |
| 810 | 2 | 0 | |a United States. |b Bureau of Mines. |t Report of investigations |v 8140 |
| 830 | 0 | |a Report of investigations (United States. Bureau of Mines) ; |v 8140. | |
| 942 | |2 ddc | ||
| 952 | |0 0 |1 0 |4 0 |6 622_061730000000000_E41P |7 0 |8 VF |9 77018 |a ML015 |b ML015 |c VF |d 2024-06-02 |l 0 |o 622.06173 E41p |p 082043 |r 2018-03-24 00:00:00 |w 2018-03-24 |y VF | ||
| 994 | 0 | 1 | |a 082043 |
| 999 | |c 57659 |d 57659 | ||


