Nalaganje...
Engineering geological feasibility study of the Naoro-Brown River Hydro Electric Scheme
Shranjeno v:
Korporativna značnica: | |
---|---|
Drugi avtorji: | |
Format: | Knjiga |
Jezik: | angleščina |
Izdano: |
[Port Moresby]
Geological Survey of PNG
1982
|
Serija: | Report
82/16 |
Teme: | |
Oznake: |
Označite
Brez oznak, prvi označite!
|
MARC
LEADER | 00000nam a2200000 4500 | ||
---|---|---|---|
001 | 00587966 | ||
003 | PWmBRO | ||
005 | 20240602100030.0 | ||
008 | 860910s1982 pp ab f0001 engbt | ||
090 | 0 | 0 | |a PR |b 624.151 |b 099546/E57 |
245 | 0 | 0 | |a Engineering geological feasibility study of the Naoro-Brown River Hydro Electric Scheme |c by G. R. Anderson ... [et al.] |
260 | 0 | 0 | |a [Port Moresby] |b Geological Survey of PNG |c 1982 |
300 | 0 | 0 | |a 84 leaves in various foliations |b ill. (some col.), maps |
490 | 1 | 0 | |a Report |d Geological Survey of Papua New Guinea |v 82/16 |
532 | 0 | 0 | |a 7 folded maps in 3 pockets |
610 | 2 | 0 | |a Naoro-Brown River Hydro Electric Scheme |
650 | 0 | 0 | |a Hydroelectric power plants |z Papua New Guinea |z Goilala District |
650 | 0 | 0 | |a Engineering geology |z Papua New Guinea |z Goilala District |
700 | 1 | 0 | |a Anderson, G. R. |
710 | 2 | 0 | |a Geological Survey of Papua New Guinea |
840 | 0 | 0 | |a Report (Geological Survey of Papua New Guinea) |v 82/16 |
942 | |2 ddc | ||
952 | |0 0 |1 0 |4 0 |6 624_151099546000000_E57 |7 0 |8 P |9 26366 |a ML015 |b ML015 |c P |d 2024-06-02 |l 0 |o 624.151099546 E57 |p 025282 |r 2018-03-23 00:00:00 |w 2018-03-23 |y P | ||
994 | |a 001025282 86253 0001 | ||
995 | 0 | 0 | |a NUNE |
999 | |c 18708 |d 18708 |