Loading…

Lime-sinter processing of anorthosite for the recovery of alumina

Saved in:
Bibliographic Details
Main Author: Edlund, V. E. (Vernal E.)
Format: Book
Language:English
Published: [Washington, D.C.] U.S. Dept. of the Interior, Bureau of Mines [1982]
Series:Report of investigations/United States Department of the Interior, Bureau of Mines 8714
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a2200000 a 4500
001 00468606
003 PWmBRO
005 20240602095147.0
008 841127s1982 dcua a o0001 eng l
069 0 0 |a 218694060  
082 0 0 |a 622 s 
090 0 0 |a VF  |b 669.722/E23L 
100 1 0 |a Edlund, V. E.  |q (Vernal E.) 
245 1 0 |a Lime-sinter processing of anorthosite for the recovery of alumina  |c by V.E. Edlund 
260 0 0 |a [Washington, D.C.]  |b U.S. Dept. of the Interior, Bureau of Mines  |c [1982] 
300 0 0 |a 21 p.  |b ill.  |c 28 cm. 
490 1 0 |a Report of investigations/United States Department of the Interior, Bureau of Mines  |v 8714 
650 0 0 |a Aluminum oxide 
650 0 0 |a Sintering 
650 0 0 |a Anorthosite 
840 0 0 |a Report of investigations (United States. Bureau of Mines)  |v 8714 
942 |2 ddc 
952 |0 0  |1 0  |4 0  |6 669_722000000000000_E23L  |7 0  |8 VF  |9 9581  |a ML015  |b ML015  |c ML015  |d 2024-06-02  |l 0  |o 669.722 E23L  |p 005321  |r 2018-03-23 00:00:00  |w 2018-03-23 
952 |0 0  |1 0  |4 0  |6 669_722000000000000_E23L  |7 0  |8 VF  |9 9582  |a ML015  |b ML015  |c VF  |d 2024-06-02  |l 0  |o 669.722 E23L  |p 005320  |r 2018-03-23 00:00:00  |w 2018-03-23  |y VF 
994 |a 001005321 85079 0002  |a 001005320 
995 0 0 |a NUNE 
999 |c 6472  |d 6472