Ag lódáil…

Alternative approaches to the procurement of building works

Sábháilte in:
Sonraí bibleagrafaíochta
Príomhchruthaitheoir: Grigg, Peter J.
Údar corparáideach: Royal Australian Institute of Architects
Formáid: LEABHAR
Teanga:Béarla
Foilsithe / Cruthaithe: South Melbourne, Vic. Royal Australian Institute of Architects, Practice Division 1978.
Ábhair:
Clibeanna: Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!

MARC

LEADER 00000nam a2200000 4500
001 00331724
003 PWmBRO
005 20240602100351.0
008 821203s1978 vraa o0001 engbn
082 1 0 |a 692.8 
100 1 0 |a Grigg, Peter J. 
245 1 0 |a Alternative approaches to the procurement of building works  |c Peter J. Grigg. 
260 0 0 |a South Melbourne, Vic.  |b Royal Australian Institute of Architects, Practice Division  |c 1978. 
300 0 0 |a 96p.  |b col.ill.  |c 21x30cm. 
595 0 0 |a 0909724261. 
650 0 |a Construction contracts. 
650 0 0 |a Buildings  |x Specifications. 
710 2 0 |a Royal Australian Institute of Architects.  |c Practice Division. 
942 |2 ddc 
910 2 0 |a R.A.I.A.  |x see  |a Royal Australian Institute of Architects 
952 |0 0  |1 0  |4 0  |6 692_800000000000000_G857  |7 0  |9 34122  |a ML015  |b ML015  |c ML015  |d 2024-06-02  |l 0  |o 692.8 G857  |p 033836  |r 2018-03-23 00:00:00  |w 2018-03-23 
952 |0 0  |1 0  |4 0  |6 692_800000000000000_G857  |7 0  |9 34123  |a ML015  |b ML015  |c ML015  |d 2024-06-02  |l 0  |o 692.8 G857  |p 033837  |r 2018-03-23 00:00:00  |w 2018-03-23 
952 |0 0  |1 0  |4 0  |6 692_800000000000000_G857  |7 0  |9 34124  |a ML015  |b ML015  |c ML015  |d 2024-06-02  |l 0  |o 692.8 G857  |p 008344  |r 2018-03-23 00:00:00  |w 2018-03-23 
994 |a 001008344 83312 0001  |a 001033836  |a 001033837 
995 0 0 |a NUNE 
999 |c 24407  |d 24407