Ngā hua rapu - Elger, G.W
- E whakaatu ana i te 1 - 8 hua o te 8
-
1
Preparation and chlorination of titanium carbide from domestic titaniferous ores / mā Elger, G. W.
I whakaputaina 1980Tau karanga: Loading…
Tauwāhi: Loading…Pukapuka -
2
Producing synthetic rutile from ilmenite by pyrometallurgy : pilot-plant studies and economic evaluation / mā Elger, G. W.
I whakaputaina 1796Tau karanga: Loading…
Tauwāhi: Loading…Tē mōhiotia -
3
Producing chlorination-grade feedstock from domestic ilmenite : laboratory and pilot plant studies /
I whakaputaina 1985 Ētahi atu kaituhi: “…Elger, G. W.…”
Tau karanga: Loading…
Tauwāhi: Loading…Pukapuka -
4
Preparation of titanium feedstock from Minnesota ilmenite by smelting and sulfation-leaching / mā Nafziger, R. H. (Ralph H.)
I whakaputaina 1987 Ētahi atu kaituhi: “…Elger, G. W.…”
Tau karanga: Loading…
Tauwāhi: Loading…Pukapuka -
5
Removal of copper from molten ferrous scrap : results oflaboratory investigations / mā Oden, L. L. (Laurance L.)
I whakaputaina 1987 Ētahi atu kaituhi: “…Elger, G. W.…”
Tau karanga: Loading…
Tauwāhi: Loading…Pukapuka -
6
Utilization of scrap preheating and substitute slag conditioners for electric arc furnace steelmaking /
I whakaputaina 1987 Ētahi atu kaituhi: “…Elger, G. W.…”
Tau karanga: Loading…
Tauwāhi: Loading…Pukapuka -
7
Physical benefication of titanium plant solid wastes: brecovery of titanium minerals and coke/ mā Paige, J.I. (Jack I.)
I whakaputaina 1982 Ētahi atu kaituhi:Tau karanga: Loading…
Tauwāhi: Loading…Pukapuka -
8
Physical beneficiation of titanium plant solid wastes : recovery of titanium minerals and coke / mā Paige, J. I. (Jack I.)
I whakaputaina 1982 Ētahi atu kaituhi:Tau karanga: Loading…
Tauwāhi: Loading…Government Document